Greater Tunis Sewerage and Reuse Project
* Extending/rehabilitating the Tunis South wastewater treatment plant (WWTP); Restructuring the western, northern and southern Tunis sewerage collection system; Connecting villages to the WWTP; Strengthening all secondary sewer systems; Miscellaneous sewer maintenance and management equipment; Environmental monitoring and management equipment and tools; Building pumping systems; Building a multi-seasonal storage basin; Equipping areas irrigated with treated sewage; Improving cost recovery and financial
*capacity of the national agency in charge of sewerage management; Introducing appropriate new sewage treatment technology;
*Development of the private sector participation; Technical assistance
- Financing: 107 millions $
Project number | P005731 | ||
---|---|---|---|
Subject(s) | WATER DEMAND , DRINKING WATER , no translation available , no translation available | ||
Geographical coverage | Tunisia | ||
Budget (in €) | 107000000 | ||
Programme | International program | ||
Web site | http://web.worldbank.org/external/projects/main?pagePK=104231&piPK=73230&theSitePK=40941&menuPK=228424&Projectid=P005731 | ||
Objectives | - The Greater Tunis Sewerage and Reuse Project will assist the government in: a) improving service levels of urban sewerage up to the average level of potable water service; b) promoting efficient reuse of effluent from sewerage treatment plants for agricultural purposes; c) reducing urban and coastal pollution; d) improving cost recovery and financial capacity of the national agency in charge of sewerage management (ONAS); e) introducing appropriate new sewage treatment technology; f) providing technical assistance to develop private sector participation in the sewerage sector; and g) acquiring environmental monitoring and management equipment and tools, and studies. - There are two components. The urban sewerage for ONAS component includes: 1) extending and rehabilitating the Tunis South wastewater treatment plant (WWTP); 2) restructuring the western Tunis sewerage collection system; 3) strengthening the southern Tunis sewage collection system and connecting villages to the WWTP; 4) extending the Northern Tunis sewage collection system and constructing a liaison conduit; and 5) extending, rehabilitating, and resizing the sewage collection networks of Central and Northern Tunis; 6) strengthening all secondary sewer systems; 7) building pumping systems; 8) acquiring miscellaneous sewer maintenance and management equipment; and 9) technical assistance, studies, and research work.
- The second component, the agricultural component for the Ministry of Agriculture, includes: 1) building a multi-seasonal storage basin with a capacity of one to two million cubic meters in the El Attar valley; 2) equipping an area of 1,000 ha to be irrigated with treated sewage; and 3) carrying out a pilot project for groundwater recharge with tertiary treated purified sewage |
||
Period | [29/05/1997 - 31/12/2005] |